Gatundu Level 5 Hospital – Block II Expansion for KUTRRH

Project Information

  • Client:JXCEC AND SWML JV
  • Date:Jun 01, 2023
  • Author: KUTRRH
  • Place: Gatundu

Gatundu Level 5 Hospital – Block II Expansion for KUTRRH

Full medical gas system installation during new block construction

Project Value: Ksh 18,495,737

Overview
This project formed part of the hospital’s expansion under Kenya’s national referral hospital framework. Medquip was responsible for installing medical-grade copper pipelines, AGSS (Anesthetic Gas Scavenging System), oxygen, vacuum, and medical air systems. The project covered over 10 critical hospital departments including the operating theatres, neonatal intensive care, maternity, and HDU. Medquip implemented automatic changeover manifolds and pressure regulation systems for seamless gas supply, ensuring the new block met international healthcare infrastructure standards.

Share:
Heshima Cleaners
CPX
Oxymat
Kaeser
Airsep
Atlas Copco